Receive report time
Mineral resources exploration
Annual Report
Project Designation
Prospecting permits license number
Prospecting people__________________-(signature)
Exploration unit _____________________(signature)
Exploration unit qualification license
Time of filling in a form
Guidance Note
1. Exploration investment at the annual exploration: that is the costs, management fees and other costs directed in the annual exploration for exploration project. Including mainly engineering method(drilling, exploration pits, shallow wells, shafts exploration, geological surveying, topographic mapping, remote sensing geological, geophysical and geochemical, etc.), laboratory tests (rock identification, testing, chemical analysis, Metallurgical tests, etc.), transportation costs, staff salaries, the preparation of the report ( map drawing, report compiling) costs.
2. Accessory:
Accounting table of the exploration project expenditure: it is the expenditure based on accounting sector form the first survey to cancel time.
3. Disposition of mineral price: the price to pay for prospecting fill in this colum.
4. Form
(Download Address: http://www.chinamr.net)